Showing posts with label Vise Versa. Show all posts
Showing posts with label Vise Versa. Show all posts

Thursday, February 5, 2015

My Trip To The Grocery Store

 

Grocery shopping is definitely not my most favorite thing to do. But someone has to do it and that would be me. Everything went fine until I got to the check out and than the gripy old lady in me came out.  The nice check out girl hung my bottled cokes over the edge of the buggy.  Then the bag guy showed up to help. 1st mistake, he decides to take the bottles off the sides of the buggy and set them in the buggy where my groceries need to go.  That got him a dirty look from me.  Then he puts the bagged lettuce and spinach in the bottom of a cooler bag and then shrugs his shoulders and pushes the orange juice that I got out of the cooler aside.  I had to tell him I wanted the juice in that cooler bag, making him have to repack the bag putting the juice, milk, and canned biscuits in.  So he thinks he’s through.  I have to ask/tell him to put the lettuce and spinach in on top of the other stuff.  This just did not make me feel like a nice sweet person.  I have yet to figure out how to politely refuse the offer to carry my groceries out to my truck.  I can do that.  I have a nice buggy to push them out in.  When I get home I have to carry the bags into the house without assistance, so why do I need help with the easy part?!

On a happier note, I have been working on my block of the months  and mystery quilts.

PickleweedsBlock2

The Pickleweeds Quilt Shop Saturday Sampler block 2. Done in time to go Saturday and get this months bock and start a BOM that they have going on.  It is a rather ambitious project.  Think there are at least 2 blocks every month and 40 flying geese to make.  I’ll know more Saturday.  It was the colors that hooked us.

ViseVersaJulyVacationTimeJan

July blocks for the Vice Versa BOM.  These are the last of the blocks, now just have to get around to getting them into a quilt top.  The second block is the  Jan. Vacation Time BOM block that Pat Sloan is doing for 2015.  I just printed out the Feb. block this morning. 

longarm

The Bonnie Hunter Grand Illusion mystery quilt is on the frame waiting for me to find time to quilt it.  I see it is still a mystery, all covered up.  I have a cat who likes to get on my quilts while on the frame. That freed up my design wall for the M is for Mystery BOM.

MforMysteryblocks

All the rows are put together, now to sew the rows into a top.  The bottom 2 rows are pinned together and waiting for me. Hope to make this next week’s project.

My poor design wall is falling apart.  I have more sheets of insulation to make a new one.  I’m just feel that is a project to procrastinate over for as long as possible.

Saturday, May 10, 2014

May BOMs Finished

 

Can’t say the same for my Quilt A Longs.  I’m behind on them and getting further behind by the minute.  I didn’t make it into my quilting studio for the past two days.  Today a lady is supposed to bring me a quilt to quilt for her and the Quilty Fun quilt is still on the frame. OnTheFrame1 I’m waiting for more fabric for the “Never Enough Chocolate” quilt A Long and I’m two weeks behind on “Delightful Stars” because of issues with Comcast email.  It seems they have taken a dislike to the Quilting Gallery and won’t let the emails through.  I requested a change of email address for the emails to be delivered to and now have my missing patterns, but haven’t had time to even think about making them. 

NeverEnoughChocolate3

Still deciding on fabrics, but getting close.  Think I will go with the fabrics in the blocks on the left, but waiting on another with black background to replace the one with the green in the blocks on the right.

 

MForMysteryMonth5

This is clue (month) 5 of the M for Mystery.  I especially love the blue paisley fabric that came this month. I want to add some to my “paisley” stash.

 

PurpleSage9PurpleSage1-9

After nine blocks I really am regretting some of my purple fabric choices.  That’s what comes from working from my stash and refusing to buy more fabric.  Use what is in my stash or forgo the project.  I’ve lighten up a little on that plan.  Although I still think it is a good way to operate. 

 

ViseVersaMayViseVersaJan-May

May Vise Versa blocks.  I so am loving this BOM.  It may be partially due to the colors I picked.

 

SewRetroKitchenMaySewRetroKitchenJan-May

So far the May block is my favorite.  This is another scrappy project.  So far I’ve been able to dig through my scrap bin for fabrics. 

 

Spring2014-1

These plastic molded chairs sure have held up well.  Think I’ve had these for around 20 years.  The one Lydia is sitting in was here mother’s when she was little. 

Thursday, April 10, 2014

Working on The BOMs

 

I just about have all of this month’s block of the months done.

SewRetroKitchenAprilSewRetroKitchenJan-April

Sew Retro Kitchen April block is the tea pot. I’m enjoying doing a little paper piecing every month. Maybe I can hang this in my kitchen when it is finished. I digging through my scrap bin to do this one.  I like doing projects that I can use my scraps to make.

 

AurifilAprilAurifilJan-April

The April Aurifil block is the bear paw block.  It seems a little dark because I didn’t use the white background fabric in it.  Think it was supposed to be used as the “paw”.  I’m thinking now I should have used the white where the red is and the red solid for the corner stones.  Well, I’m not going to redo the block just yet.  I prefer to “wait and see” if it stands out too much when more blocks have been made.

 

ViseVersaAprilViseVersaJan-April

A star for the Vise Versa April block.  I’m really liking these blocks.  I think the reason is the colors I’m using.

Poinsettias2

So far so good.  My poinsettias are still alive and have new shoots growing.  It is time to start setting them out side during the day.

Sunday, March 9, 2014

Keeping Up

 

So far I am managing to keep up with all 11 BOMs and Quilt Alongs.

ViseVersaMarch

My March Vise Versa blocks. When I was trying to get caught up last month, I put this BOM off to do last, because I just couldn’t get into it.  Now I can’t figure out why.  I’m just loving these cute 9’ blocks.

EVQGMysteryClue2

Clue 2 of the Etowah Valley Quilt Guild Mystery.  Did these as my leaders and enders and managed to finish before clue 3 comes out next week.  I hope I can continue to do the clues as my leaders and enders.

MForMysteryMonth3

Month 3 of the M for Mystery BOM.  There are a lot of busy fabrics in this.  I am curious to see how it turns out.

I’m doing a really easy pattern for the first memory quilt.  Got all the parts cut and 5 of the blocks made.  It is a little early to tell how it is going to turn out.  There were a lot of knit and rayon fabrics. I had to back most of them with fusible interfacing.  I felt unsure about cutting up all those cloths.  It isn’t the same as cutting regular fabric.

Monday, February 24, 2014

Still Trying To Get Caught Up

SewRetroKitchenJan&Feb

Quiet Play’s Sew Retro Kitchen Jan. & Feb. blocks. This is a paper pieced BOM that  I’m doing. I’m not a big fan of paper piecing but thought one block a month to keep in practice wouldn’t hurt.

 

PurpleSage5&6I

Jan. & Feb. Purple Sage blocks.  I’m really liking the purple and gray.

 

ViseVersaJan&Feb

This is another fun BOM that I’m doing.  It is called Vise Versa.

 

DelightfulStarsLessons1-5

I finally got to start the Delightful Stars blocks.  Glad it is caught up.  This is a weekly Quilt Along.  The next block (lesson) will be out tomorrow.

 

Our guild is doing a mystery quilt this year.  We are doing one clue a month.  Gives us plenty of time to get each clue done.  I’m doing the first two clues as leaders and enders.

EVQGMysteryClue1

I finished the 1st clue this week end. Maybe I will get the 2nd clue done by the 2nd Tuesday of March.  There are a lot more half square triangles this clue than the first one. 

 

I still have a couple BOMs to get caught up on besides keeping up with the two quilt Alongs.  Wait, think I decided to Do Pat Sloan’s scrap buster challenge/BOM.  Plus I’m supposed to be working on UFOs too each month. At least I won’t run out of quilting projects any time soon.